Since 2007 — dredging pipeline systems [email protected] +86-511-86238838
Suction hose with steel flanges of the type fitted to a trailing suction hopper dredger drag arm

TSHD Suction and Jetting

Drag arm suction, drag head jetting and deck flushing on a trailing suction hopper dredger.

How the system fits together

On a TSHD the drag arm moves with the sea while the pump pulls a vacuum through it, and the drag head is jetting at pressure at the same time. Two hoses, two completely different specifications, and the common mistake is selecting both on bore size.

Section by section

What goes where

1

Drag arm suction

Suction hose rated -0.1 to 1.0 MPa, reinforced against collapse, with internal steel rings absorbing pump vibration before it reaches the arm mountings.

2

Drag head jetting

Jet water hose in 100-400 mm bore at 0.5-2.5 MPa, built around pressure capability rather than abrasion, in modular sections that integrate into the existing flushing system.

3

Deck pipework

Expansion joints taking up movement between fixed deck runs and damping vibration into the structure.

4

Hopper discharge

Discharge hose and floating line where the vessel pumps ashore, on flange drilling matched to the shore connection.

Quote the system, not the parts

Send the vessel, the line layout and the flange standard already in service.