What this work asks of a pipeline

Tailings and mine slurry ask the same question as dredging spoil but usually with a harsher answer: finer abrasives, longer continuous running, and lines that are not easy to get at once they are laid. The construction that survives it is the one built for angular material rather than for clean sand.

Common failure points

What tends to go wrong

1

Continuous abrasive flow wears a standard lining through at a predictable but inconveniently short interval.

2

Heavy project loads and mixed materials stress joints that were specified only on bore size.

3

Access for section replacement is often worse than on a marine line, so early failure costs more.

Our approach

What we specify instead

  • Armored construction with embedded wear-resistant steel rings for the abrasive positions.
  • Sandwich-flanged discharge hose handling project loads and materials of up to 16 tons.
  • Wear warning layers so sections are changed on a schedule rather than on a failure.

Working on a project like this?

Send the material, the vessel and the line layout. We will come back with what we would specify and why.