Since 2007 — dredging pipeline systems [email protected] +86-511-86238838
Heavy dredging hoses staged in the factory yard before a port construction contract

Port and Channel Construction

Capital works in coarse and rock material, where armored construction decides the replacement interval.

What this work asks of a pipeline

Port deepening and new channel works usually mean cutting material that was never meant to be pumped: weathered rock, coral reef, coarse gravel with angular grains. A conventional lining does not survive a campaign in that, and the cost shows up as section replacements rather than as a line item in the tender.

Common failure points

What tends to go wrong

1

Angular high-hardness particles cut a standard lining open well before the rest of the line is worn.

2

Sections mounted on the cutter ladder have to bend and resist abrasion at the same time.

3

Bare steel flange faces erode from the inside where the slurry passes the joint.

Our approach

What we specify instead

  • Armored discharge hose with HB 450+ wear-resistant steel rings embedded in the NR/SBR lining.
  • Sandwich flanges where the joint face itself is a known wear point.
  • Steel pipe with increased wall thickness or internal wear-resistant lining for the fixed high-wear positions.

Working on a project like this?

Send the material, the vessel and the line layout. We will come back with what we would specify and why.