The pipeline is what decides whether the dredger keeps working
Floating hose, suction hose, PE floats, HDPE and steel pipe built as one line. ID 100-1100 mm, working pressure to 4.2 MPa, sections that bolt into what you already run.
Buoyancy that does not depend on a shell staying sealed
PE floats with a seamless weld-free polyethylene shell and closed-cell PU foam core. Buoyancy from 150 kg to 5000 kg per unit, for HDPE and steel pipe.
Eight floating hose lines and ten rubber sleeve lines
A 0.68 million square metre plant with over 150 staff, producing 3 to 4 floating hoses and 10 rubber sleeves a day. Member of CEDA, WEDA and the China Dredging Association.
Four product groups, one pipeline
A dredging line is a sequence of different duties. Suction that must not collapse, discharge that must not wear through, buoyancy that must not migrate, and fixed pipe that must not deform. We build all four, on one flange table.

Dredging Rubber Hose
Discharge, suction, floating, armored and jetting hose, plus expansion joints. ID 100-1300 mm.
Browse category
PE Float
Seamless PE shell with closed-cell PU foam core. Buoyancy 150-5000 kg, plus pipe laying floats to 3000 m.
Browse category
HDPE Pipe
PE100 grade dredging pipe, OD 200-800 mm, 0.6-1.5 MPa, flanged or plain ended.
Browse category
Dredging Steel Pipe
Land, floating and submerged steel pipe. ID 100-1100 mm, working pressure to 4.2 MPa.
Browse categoryWhere most enquiries start
Full specifications, structure breakdowns and selection guidance on every product page.

Floating Rubber Hose
Self-floating discharge hose with a buoyant interlayer, floats empty or working. ID 200-1100mm, 0.5-4.2MPa.
View specifications
Armored Discharge Rubber Hose with Steel Flange
Steel-ring armored discharge hose for coral reef and weathered rock, HB>=450 wear rings, ID 100-1100mm.
View specifications
Suction Rubber Hose with Steel Flange
Vacuum-rated suction hose for TSHD drag arms and CSD cutter ladders, -0.1 to 1.0MPa, ID 100-1100mm.
View specifications
PE Float with Location Slot
PU-filled PE float with a location slot that grips the pipe, buoyancy 150-5000kg, ID 110-1200mm.
View specificationsThe problem changes with the project
Capital works in rock ask a different question from maintenance dredging in silt. These pages set out what tends to fail in each, and what we specify instead.

Capital and Maintenance Dredging
Keeping channels at depth, where the line runs continuously and section rotation drives the maintenance plan.
How we approach it
Land Reclamation
Long delivery lines that are repositioned as cells fill, needing sections that come apart and go back together.
How we approach it
Port and Channel Construction
Capital works in coarse and rock material, where armored construction decides the replacement interval.
How we approach itSpecified as a system, not as separate parts
Ordering the suction, the pump connection and the discharge run separately is how a line ends up with mismatched flanges and mismatched service lives.
CSD Pipeline System
Ladder suction, pump connection and discharge line for a cutter suction dredger, specified as one system.
TSHD Suction and Jetting
Drag arm suction, drag head jetting and deck flushing on a trailing suction hopper dredger.
Floating Discharge Line
Getting the delivery line across open water, by buoyant hose or by floated pipe.
Onshore and Submerged Line
From the shore connection to the discharge point, including crossings that have to go under traffic.
Built at the parent factory, sold as one line
Jiangsu East Marine Industrial Co., Ltd. is the international trade arm of Jiangsu Huashen Special Rubber Products Co., Ltd.. The hoses are made on a site of 0.68 million square metres with over 150 staff: eight production lines for floating hoses and ten for rubber sleeves, producing 3 to 4 floating hoses and 10 rubber sleeves a day.
We joined the China Dredging Association in 2013, presented at the 21st World Dredging Congress in 2016, joined the China Rubber Industry Association in 2020, CEDA in 2022, and WEDA in 2023, the same year a branch was established in Singapore.

What every hose goes through before it ships
Raw material test
Each batch of raw materials, including natural rubber, tensile textile and rubber additives, is inspected before entering the warehouse to ensure quality consistency and durability.
Hose dimension check
Inner and outer diameters, wall thickness and flange alignment are measured to confirm they meet design specifications.
Weight check
Each hose is weighed to verify it falls within the acceptable tolerance range, ensuring uniform product quality.
Pressure test
Hydrostatic or vacuum pressure testing is carried out where specified, to confirm the hose safely withstands its specified working pressure.
Third-party inspection
An independent inspection agency can be invited to inspect according to customer requirements.
Contractors we supply
Listed on our client page as customers of East Marine dredging pipeline.
Engineering notes
Selection and layout questions that come up repeatedly, answered from what we see on the line.
The Changing Demand for Dredging Pipelines and What Is Driving It
Dredging pipelines transport slurry, sediment and dredged material from rivers and lakes to disposal sites or land reclamation projects. However advan
Engineering noteWill Floating Rubber Hoses Float Forever
One of the questions asked most often of a floating hose supplier. The short answer is that they do not float under all conditions, and the reasons co
Engineering noteTechnical Description of the Floating Dredging Rubber Hose and Pipeline System
The floating dredging hose is an integrated flexible pipeline engineered for waterborne dredging, combining a sealed buoyancy structure with a high-st
Send us the line, not just the part number
Tell us the dredger, the material and the flange standard already in service, and we will come back with a specification that bolts into it.