Heat Exchanger Bundle Supply
Buying a bundle's parts from three suppliers means three interpretations of one drawing. This is the route where tube, fin and tube plate come from the same document and the same works.
From Enquiry to Delivery
Seven steps, each with a decision that belongs to it. Nothing is left to be discovered at assembly.
What This Solution Uses
Stainless Steel Tube
Austenitic and super austenitic seamless tube and pipe to ASTM A213, A269 and A312
Tube outside diameter: 1/2" - 3" (12 mm - 76.2 mm) · Tube wall thickness: 0.02" - 0.5" (0.5 mm - 12.0 mm)
Tubesheet
Drilled tube plate up to 5000 mm diameter and 750 mm thick
Maximum outside diameter: 5000 mm · Maximum thickness: 750 mm
"G" Embedded Fin Tube
Fin strip rolled into a machined groove in the tube wall for permanent metal-to-metal contact
Base tube diameter: 16 mm - 80 mm · Base tube wall thickness: 1.65 mm - 4.0 mm
Low Fin Tube
Integral low fin rolled from the tube wall itself, for shell and tube exchangers
Base tube diameter: 12.7 mm - 31.8 mm · Base tube wall thickness: 1.65 mm - 3.0 mmWhat Sits Behind the Promise
- 25 rolling and cold drawing machines in the seamless tube workshop
- 23 fin machines and lines across eight fin geometries
- Tubesheets machined to 5000 mm outside diameter and 750 mm thickness
- Hydro, eddy current, mechanical, chemical and dimensional testing in house
- ISO 9001:2015, CE certificate, Production licence for pressure pipe

Heat Exchanger Bundle Supply Questions
Can you supply tube and tubesheet on one order?
Yes. Both are produced against the same bundle drawing, which is the point of the route.
What do you need to start?
The bundle drawing, the tube schedule and the tubesheet layout. If they disagree with each other we raise it before quoting.
Do you assemble the bundle?
We supply the tube, the finned tube and the drilled tube plate. Bundle assembly stays with the fabricator.
How is the shipment packed?
Bundles are packed for sea freight to the destination port you nominate.
Start With the Drawing
Send the bundle drawing, the process data or the tube schedule. The first thing you get back is a list of what is missing, not an invoice.
[email protected] · Tel 0086 512 58392615 · Monday to Saturday, 08:30 - 17:30 China Standard Time (GMT+8)












