Quality Control

Every Tube Tested Before It Leaves

Quality is part of every aspect of our company. We work with well known raw material suppliers including Yongxing steel, and inspect the goods carefully during every process.

Test Chain

What Each Test Is Looking For

Eight checks, carried out on our own equipment rather than sent out and waited for.

Eddy current

Scans the full tube length for surface and near-surface discontinuities.

Hydro test

Proves the tube against internal pressure and finds through-wall defects.

Tensile testing

Establishes yield, tensile strength and elongation against the specification.

Flattening testing

Checks ductility and how the tube behaves when it is deformed.

Flaring testing

Confirms the tube end can be expanded without splitting - what a rolled joint does to it.

Hardness testing

Verifies hardness where the grade or the service requires a limit.

Chemical testing

Confirms composition on the spectrometer and the direct-reading optical emission spectrometer.

Dimension inspection

Diameter, wall, length, straightness and, on finned tube, fin pitch and fin height.

Inspection Equipment

The Laboratory Floor

Universal testing machine used for tensile testing
Universal testing machine used for tensile, flattening and flaring tests.
Operator running a test on the universal testing machine
Operator running a mechanical test on the universal testing machine.
Metallurgical microscope used for structure examination
Metallurgical microscope used for structure examination.
Direct-reading optical emission spectrometer used for chemical analysis
Direct-reading optical emission spectrometer confirming chemical composition.
Vernier caliper measuring fin pitch on a finned tube
Vernier caliper checking fin pitch on a finned tube.
Tape measure used to check the length of finished tube
Length measurement recorded on finished tube.
Equipment List

What We Test With

  • Hydro test machine
  • Eddy current machine
  • Spectrometer
  • Universal testing machine
  • Impact testing machine
  • Metallurgical microscope
  • Intergranular corrosion equipment
  • Hardness tester
  • Hydraulic equipment
  • Direct-reading optical emission spectrometer
Certification

Certificates and Licences

  • ISO 9001:2015
  • CE certificate
  • Production licence for pressure pipe

Third party and customer witnessed inspection can be arranged if it is agreed at enquiry stage, so the test plan is fixed before production starts.

Ask About Certification

FAQ

Quality and Certification Questions

Which tests are applied to every tube?

Eddy current and hydrostatic testing. Mechanical and chemical tests follow the sampling rules of the applicable ASTM or ASME specification.

What certificates do you hold?

ISO 9001:2015, a CE certificate and a production licence for pressure pipe.

Can we witness the testing?

Yes, third party and customer witnessed inspection can be arranged if it is agreed at enquiry stage.

Do certificates ship with the goods?

Yes. Testing is done in house, so certificates travel with the shipment rather than following it.

Agree the Test Plan Before Production

Tell us the standard, the witnessing requirement and the certificate scope with the enquiry. It costs nothing then and a great deal later.