Skip to content
Tigeriver Printing & Packaging Co., Ltd logo

FAQ Article · 5 min read

Lead Times MOQ And Sampling Answered

Every published minimum, sample cost, sample lead time and production lead time in one place, product line by product line.

Lead Times MOQ And Sampling Answered

Minimum Order Quantities

  • Folding paper boxes: as low as 100 pcs. Small quantities are accepted for start up customers.
  • Plastic bags: 20,000 pcs.
  • Paper bags, rigid boxes, poly mailers, bubble mailers, retail signage and labels are quoted against the specification, because size, material and colour count move the break points.

Samples

  • Folding paper box: free plain sample within 7 days, freight paid by the customer.
  • Rigid cardboard box: sample lead time 3 to 5 days.
  • Plastic bag: free stock samples offered, customised samples in 5 to 10 working days by express, part or full sample fee refunded after the deposit is received.
  • Custom development sample with insert tray: usually around USD 300 for the box and insert tray mould together, courier excluded, normally refunded on orders above 10,000 pcs.
  • General development sampling: 7 to 10 days plus 3 to 7 days international courier.

Production Lead Times

  • Rigid cardboard box: 10 to 15 days based on quantity.
  • Folding paper box: 10 to 15 days subject to quantity.
  • Plastic bag: 10 to 15 working days after the design is confirmed.
  • Retail signage: 5 to 7 days on this line, and 5 to 15 working days after file confirmation and deposit.
  • General mass production: normally 3 weeks.

Shipping Time

Inland transport within China is normally about 1 week, and sea freight to major world seaports is normally another 4 weeks. Air, express and land options are available where the schedule needs them. Shipment ports used are Guangzhou, Shenzhen and Hong Kong depending on the line.

Payment Terms

  • Folding paper box: 30% deposit, balance paid before shipping. FOB or CIF.
  • Plastic bag: T/T, PayPal, Western Union or Trade Assurance, 50% deposit and 50% balance before shipment.
  • Rigid cardboard box: credit card, T/T, L/C, Western Union, PayPal or Trade Assurance.

Planning Backwards From A Launch Date

For a new pack developed from scratch, a realistic plan is 7 to 10 days sampling, 3 to 7 days courier, an artwork round with your designer, then 10 to 15 days production, 1 week inland and 4 weeks at sea. Work backwards from the date the stock has to be in your warehouse, and start the sampling conversation earlier than feels necessary.

How To Speed It Up

  • Send a physical product sample with the first enquiry, not after the first quotation.
  • Approve the die line before the artwork is finished, so the two run in parallel.
  • Use digital printing for short run versions to skip plate making.
  • Confirm the colour reference once, at the start, for the whole set.

FAQ

Article FAQ

Where do the figures in this guide come from?
From our own product specifications and published production data, the same information shown on the product pages linked at the bottom of this article.
Can you advise on my specific case?
Yes. Send the product, the quantity and the destination market on WhatsApp or by email and we will give a specification recommendation.
Is there a PDF version?
The Download Center carries PDF datasheets, the material guide, the process guide and the quality control checklist.
How do I get a price after reading this?
Send the specification you have arrived at and we will quote it with a lead time and a sample plan.

Question not answered here? Ask us on WhatsApp

Next Step

Apply This To Your Own Product

Send the product, the quantity and the destination market and we will return a specification and a price.

Mr Parker[email protected]WhatsApp and WeChat +86 159 2024 3450Mon to Sat, 09:00 to 18:00 China Standard Time (GMT+8)