PCB Drilling Machine Maintenance Guideline

This maintenance guideline covers the PCB board drilling machine as a CNC process centre. It also applies to the routing machine.

This maintenance guideline covers the PCB board drilling machine as a CNC process centre. It also applies to the routing machine.

Published 2023-09-11 by Chengdu Jindali Technology Co., Ltd

Daily Maintenance

Carried out before and after the machine runs each day. Ten items are checked and the machine is not released to production until each one is clear.

Carried out by the night shift team with the teams on duty in turn. Duration is about one hour. Cut off the power supply first and then follow the steps.

Carried out by the day shift team with the teams on duty in turn and repair staff included. Cut off the power supply first then follow the steps and make the spare parts list. Duration is about one and a half hours.

Machines Covered in This Guide

PCB Drill Bits Milling Cutters and Consumable Parts

DLCNC fully supports customers for spare part sourcing and supply on the machine.

D2X PCB Drilling Machine

Independent Z axis structure on XYZ ball screw drive. The independent Z axis holds the vertical accuracy of the machine and improves th...

6 Heads PCB CNC Routing Machine

Six head routing machine for volume batch board routing. It is the model chosen when the routing station has to keep pace with the rest...

Related Guides

PCB Drilling Hole Location Accuracy and CPK

Good hole location accuracy makes the following processes easier and to some extent even makes up for weakness...

How To Choose a CNC Drilling and Routing Machine

CNC machines are vital in PCB processing. These are the points DLCNC engineers work through with a buyer befor...

Questions On This Guide

Does this schedule apply to routing machines

Yes. The PCB board drilling machine maintenance schedule also applies to the routing machine.

Why run the spindle at low speed for ten minutes

It is part of the daily spindle and tool cassette check and is done with the machine in a clean condition before production.

Why is the power cut before weekly and monthly work

Both the first level and second level schedules start by cutting off the power supply before any of the steps are carried out.

Have a Question This Guide Did Not Answer

Send it to an engineer. Answers come from the people who build and commission the machines.

CAD and drawing files are accepted on request through WhatsApp or email. No form to fill in.