Economic Development Area, Hanchuan City, Hubei Province, China [email protected] +86 15172228686
Shoe Manufacturing using HuiLai polyester sewing thread

Polyester Sewing Thread For Shoe Manufacturing

High-strength stitching holds upper and sole together through daily wear and abrasion.

Industry pain points

What Goes Wrong In This Sector

These are the three complaints we hear most often from buyers in shoe manufacturing, and what the mill does about each.

1

Thread sawing through at the flex point of the upper

Thread sawing through at the flex point of the upper

2

Needle heat on thick leather and synthetic stacks

Needle heat on thick leather and synthetic stacks

3

Small colour lots for seasonal ranges that no large mill wan

Small colour lots for seasonal ranges that no large mill wants to run

Delivery capability

What We Can Commit To

Capacity is only useful if it turns into a date. These are the figures the mill quotes on every order.

Producing and exporting since2014
Factory area75,000 m²
Installed spindles100,000
Monthly output1,000 tons
Supply ability quoted per item800 tons per month
Raw material100% YIZHENG polyester staple fiber
TwistingTFO or ring twist, S or Z direction
Shipment15-25 days after deposit or original L/C
PaymentT/T, L/C
Sample lead time3-7 days
Finished cartons staged for container loading
Finished cartons staged for container loading
Questions

Questions From Shoe Manufacturing Buyers

Which count should I start with for shoe manufacturing?

Most buyers in this sector start with 20S/2 and adjust after a machine trial.

Can you match a colour we already use?

Yes. Send a physical swatch or a colour card reference. A lab dip is approved before bulk dyeing starts.

What is the smallest order you will run?

Finished sewing thread starts at 500 kg for black and white and 200 kg for other colours. Yarn is 10 tons.

How fast can we get a sample?

Samples are ready in 3-7 days.

Get A Thread Recommendation For Your Fabric

Tell us the fabric, the machine and the seam and we will tell you which count to sample.