Minimum order quantity
Yarn, raw white or dyed, has a 10 ton MOQ. Finished sewing thread is lower: 500 kg for black and white, 200 kg for other colours. The difference reflects how the two are produced, not how important the order is.
Sampling
Samples are prepared within 3-7 days. Run the sample on your own machine at production speed before ordering. A thread that behaves on a bench does not always behave on a line.
Production lead time
Shipment is 15-25 days after the deposit or the original L/C is received. The clock starts at the money, not at the enquiry.
Payment
T/T and L/C are both accepted. FOB, CIF and DDP shipping terms are supported, with sea freight for bulk and air freight for urgent orders.
Where the goods ship from
The plant is in the economic development area of Hanchuan City in Hubei, close to the Wuhan port, airport and rail hub.


