Tianjin MIC Valve Co., Ltd. · Valve manufacturer in Tianjin China since 1998
Blue flanged rubber expansion joints stacked in the MIC Valve finished goods store

Project Valve Packages From One Tianjin Plant

Most valve problems on a project are coordination problems. This route puts every item on the line list into one order, one inspection record and one container.

Stage by Stage

How a Project Package Is Put Together

Each stage below lists the problem buyers hit and what we do about it.

1

Line List Review

Problem: Schedules arrive in different formats and half the duties are missing.

We take the list in any format and come back with the questions that actually change the selection.

2

Model Matching

Problem: Buyers are asked to pick from a catalogue without knowing which body suits the duty.

Each line gets a model code, a body style and a seat, with the reasoning stated in one line.

3

Consolidated Quotation

Problem: Separate quotes from separate suppliers never add up to the whole scope.

One quotation covers valves joints strainers and actuators with a specification sheet per item.

4

Production Scheduling

Problem: Part deliveries stall the site while the last items are still being made.

The order is scheduled to complete as one lot so the container ships full.

5

Inspection

Problem: Test records turn up months later or not at all.

Shell seat and travel checks are recorded during production and issued with the shipment.

6

Despatch

Problem: Marking does not match the site asset register and nothing can be found.

Marking and packing follow your numbering, and loading is 50 km from Xingang seaport.

What You Get

Outcomes of This Route

  • A single supplier for every valve and joint on the schedule
  • One set of test records covering the whole package
  • Marking and packing that match your own asset numbering
  • One container instead of part shipments from several suppliers
What We Need From You

Information To Send Us

  • The valve schedule or line list in any format
  • Medium temperature and pressure for each line
  • Flange standard and drilling used on site
  • Any marking documentation or packing requirements
  • Required delivery window for the site programme
FAQ

Project Valve Packages FAQ

Can you quote from a drawing rather than a list?

Yes. Send the P&ID or the general arrangement drawing and we will pull the valve schedule off it and confirm it with you before pricing.

Do actuators come fitted?

Yes. Levers gearboxes and pneumatic or electric actuators are fitted, set and tested at our plant so nothing has to be assembled on site.

Can the package include items you do not make?

We quote what we manufacture: valves joints strainers water meters and actuators. If your list needs something outside that we say so rather than sub-buying it quietly.

How is the package inspected?

Shell tightness seat tightness and full travel are checked on the assembled valves and the records are issued with the shipment on request.

Send the Whole Line List at Once

It is faster for both of us than pricing one valve at a time.

Language