How Every Valve Is Checked Before It Leaves Tianjin
Two management system certificates, 10 sets of imported inspection equipment and a fixed test sequence on every assembled valve.
What We Are Certified To
We list only the certificates the factory holds. Nothing else is claimed on this site.
ISO 9001 Quality Management System
Design development manufacturing inspection and testing all run under the certified quality assurance system. Test records for your order are issued on request.
ISO 14001 Environmental Management System
Environmental management across the plant is certified to ISO 14001, covering the casting machining and coating operations on site.
Every Valve Passes These Checks
Castings and bought-in components checked before they reach machining
Body face-to-face length and flange drilling checked against the drawing
Disc stem and seat assembled as a matched set and travel set
Body pressure tightness verified on the assembled valve
Seat tightness checked in the closed position before marking
Operating torque full travel marking and coating checked before packing
Machining and Testing Capacity
- 59 sets of large and medium fine machining equipment for bodies discs and stems
- 10 sets of inspection and testing equipment imported from abroad
- Pressure test rigs used for shell and seat tightness on assembled valves
- Dimensional checking of face-to-face length and flange drilling before assembly
- Coating inspection on the epoxy finish before valves are marked and packed
- Records kept against the order so certificates can be reissued later


How the Valves Reach You
- Sealing faces are protected before valves leave the assembly area
- Valves are marked to the order numbering so site teams can find them
- Actuators and gearboxes are fitted and set before crating, not shipped loose
- Orders are crated as one lot so a project ships in a single container
- Loading is 50 km from Xingang seaport, about a sixty minute drive from the plant




Quality and Inspection FAQ
What tests are done on every valve?
Shell tightness, seat tightness and full travel with operating torque are checked on the assembled valve before it is marked and packed.
Can we get the test records with the shipment?
Yes. Test records and material certificates are issued with the order when you ask for them at the time of ordering.
Can we send a third party inspector?
Yes. Third party inspection at our plant is arranged around the production schedule. Tell us at order stage so the test can be witnessed.
Which certificates does the plant hold?
ISO 9001 quality management and ISO 14001 environmental management. Product approvals required in your own market are confirmed before order rather than assumed.
How are the valves protected in transit?
Sealing faces are protected, bolt holes are plugged where required, and the valves are crated as one lot with marking that matches your order numbering.
Need the Certificate Copies
We send scans of the ISO certificates and the test records for your order on request.
