Since 2013 - brass, silver and stainless steel jewelry made in Guangzhou
Nine views inside the BlueOne Jewelry workshop in Panyu, Guangzhou: setting, polishing and assembly benches
Solutions

OEM and ODM Jewelry Manufacturing

Bring us a drawing and we will build it, or start from our design team and sell the result under your own brand. Both routes run through the same 16 step process in Panyu.

What OEM means here

You own the design. We cut the master, make the mould and run production to your specification. The mould stays on your account, so repeat orders start from the mould rather than from the drawing.

What ODM means here

Our 15 person design team develops styles for cross-border sellers continuously. You pick from that development work, adjust what you want changed and sell it under your own brand.

Where the two meet

Most customers end up somewhere in between: an existing style with a different stone, a different plating colour or a different length. That is the cheapest way to get something distinctive, because the mould already exists.

Step by Step

How It Runs

  1. RequirementTell us the style, material, plating, stone and quantity. A photo is enough to start.
  2. QuotationWe quote against a specification, not a guess, so the price holds.
  3. SampleThe sample is made and photographed for your approval before bulk production.
  4. Deposit and productionProduction is scheduled once the sample is approved and the deposit received.
  1. Inspection6 rounds of inspection during and after production.
  2. ShipmentPacked and shipped by the method you nominate.
The Full Sequence

Sixteen Steps in the Workshop

Whichever route your order takes, it passes through the same documented process.

01

Concept and Design

CAD drawing and 3D rendering from your sketch, sample or reference photo.

02

Plate Making

The master pattern is cut and finished by hand before any mould is made.

03

Manufacture of Moulds

Silicone moulds are cut from the master so the shape repeats exactly.

04

Mould Injection Wax

Wax is injected into the mould to produce the pattern for each piece.

05

Wax Inlay

Stones that are cast in place are set into the wax at this stage.

06

Growing Wax Trees

Wax patterns are assembled onto a sprue tree ready for investment.

07

High Temperature Furnace Melting

Brass, silver or steel is melted and poured into the invested flask.

08

Cutting Table

Cast pieces are cut from the tree and the sprue marks are removed.

09

Sanding

Each piece is sanded to take out casting texture before finishing.

10

Buckle and Chain

Clasps, jump rings and chain sections are fitted to the body.

11

Welding

Joints and findings are welded so the piece holds under daily wear.

12

Grinding

Barrel and wheel grinding evens the surface across the whole batch.

13

Stone Setting

Cubic zirconia, moissanite and opal are set by hand, stone by stone.

14

Polishing

Hand polishing brings the metal up before it goes to the plating line.

15

Plating

Yellow gold, white gold or rose gold is plated over the finished body.

16

Assembly

Final assembly, inspection and packing for the order.

FAQ

OEM and ODM Manufacturing - Questions

How does oem and odm manufacturing start?

Email describing what you need. Michael Xiao will come back with the questions that have to be answered before a quotation can be accurate.

Is there a charge for sampling?

Sampling and tooling are quoted per development. The cost depends on how much new tooling the design needs - a change to an existing style costs far less than a new mould.

Do you keep our moulds?

Yes. The mould stays on your account, which is why a repeat order is quicker and cheaper than the first one.

Can you work from a physical sample?

Yes - a physical sample is the easiest reference to work from. A photograph, a sketch or a CAD file all work too.

What happens if the sample is not right?

It gets corrected and re-sampled. That is the entire purpose of the sampling stage, and it is far cheaper than correcting a bulk order.

Start a OEM and ODM Manufacturing Enquiry

The more of the specification you can fix up front, the more accurate the quotation will be.

[email protected] Monday to Saturday, 09:00 - 18:00 China Standard Time (GMT+8)