Líneas aéreas de transmisión
Las líneas de transmisión se construyen una vez y se mantienen durante treinta años, por lo que la decisión del aislante es realmente una decisión de mantenimiento tomada décadas de antelación.
Lo que se mete en el camino
Los cuatro problemas que este sector nos trae
String reliability over decades
A disc with a high deterioration rate turns a planned inspection interval into an unplanned outage. Our U70 series publishes annual deterioration rates of 0.04, 0.01 and 0.005 %.
Coupling discipline across a fleet
Long lines get built in sections by different contractors. We supply the same 70 kN disc in 16 mm and 16C couplings so a network can standardise electrically without forcing one coupling everywhere.
Tender compliance
Each batch ships with quality certificates, material certificates and test reports, which is what project acceptance actually asks for.
Delivery against a construction programme
Stringing crews are the expensive resource. Bulk order logistics are planned per project, with real-time tracking, so discs land before the towers are ready rather than after.
Productos recomendados
Lo que generalmente suministramos aquí

Disco de porcelana de 70 kN, espaciamiento de 146 mm, 320 mm, acoplamiento de 16C.
Ver especificaciones
Disco de porcelana de 70 kN, espaciamiento de 146 mm, 320 mm, acoplamiento de 16 mm.
Ver especificaciones
Posto de línea de porcelana, 160 mm de diámetro, 305 mm de altura, 400 mm de gropage, 8 kN cantilever.
Ver especificacionesRespuestas
Overhead Transmission Lines: questions we are asked
What voltage levels do you supply for?
Our core voltage capability covers systems up to 500 kV AC and 400 kV DC. The products listed on this site are the distribution and sub-transmission range; send us your line voltage and we will confirm what we can supply.
How many discs per string should we plan for?
As a planning reference, around 10 units per string at 110 kV and 20 or more at 500 kV, adjusted for pollution class and altitude. We will work the configuration through with your line design.
Do you provide on-site support during stringing?
For large projects we send engineers for on-site installation, debugging and construction guidance.
Working on a overhead transmission lines project?
Enviar los datos de línea y el horario de cantidad. Nuestros ingenieros volverán con una selección, un paquete de documentación y un precio entregado.