The powerful Link in Your Grid — ناسورات خنازير من بينغكسيانغ، جيانغسي، الصين

خطوط النقل الهوائية

وتُبنى خطوط النقل مرة واحدة وتُصان لمدة ثلاثين عاماً، لذا فإن قرار الإرسال هو حقاً قرار صيانة يتخذ قبل عقود.

قذائف شعاعية على سيارات الكيلونز التي تدخل إلى كشك النفق في محطة باوفانغ
Inside the Baolifeng plant in Pingxiang, Jiangxi, where every insulator supplied to this sector is formed, fired and tested.

ما يعترض الطريق

المشاكل الأربعة التي يجلبها هذا القطاع لنا

String reliability over decades

A disc with a high deterioration rate turns a planned inspection interval into an unplanned outage. Our U70 series publishes annual deterioration rates of 0.04, 0.01 and 0.005 %.

Coupling discipline across a fleet

Long lines get built in sections by different contractors. We supply the same 70 kN disc in 16 mm and 16C couplings so a network can standardise electrically without forcing one coupling everywhere.

Tender compliance

Each batch ships with quality certificates, material certificates and test reports, which is what project acceptance actually asks for.

Delivery against a construction programme

Stringing crews are the expensive resource. Bulk order logistics are planned per project, with real-time tracking, so discs land before the towers are ready rather than after.

الردود

Overhead Transmission Lines: questions we are asked

What voltage levels do you supply for?

Our core voltage capability covers systems up to 500 kV AC and 400 kV DC. The products listed on this site are the distribution and sub-transmission range; send us your line voltage and we will confirm what we can supply.

How many discs per string should we plan for?

As a planning reference, around 10 units per string at 110 kV and 20 or more at 500 kV, adjusted for pollution class and altitude. We will work the configuration through with your line design.

Do you provide on-site support during stringing?

For large projects we send engineers for on-site installation, debugging and construction guidance.

Working on a overhead transmission lines project?

أرسل البيانات والجدول الزمني للكميات مهندسينا سيعودون باختيار مجموعة وثائق وثمن تسليم