Pre-Shipment Inspection Before The Container Closes
Engineers verify finished goods against your specification at 100 percent production and 80 percent packing, checked against destination market regulations.
During a pre-shipment inspection our engineers verify that the finished goods conform to your specification. It generally happens when production is 100 percent complete and packaging is about 80 percent complete, which is the last point where a problem can still be fixed cheaply and in the right country. Inspecting manufactured goods before shipment is time sensitive and complex, and it sits inside an international framework.
Product families
Need this line on an order?
Send the size, the capacity or the whole bill of materials. You will get a quotation and a lead time rather than a catalogue PDF.
