Buyers working to a fixture schedule and a handover date, where a wrong drop length is a programme problem.

A contractor is not buying a fixture; they are buying a date. A pendant that arrives on time with the wrong drop is later than one that arrives a week late with the right one, because the second can be installed and the first cannot.

That is why we ask for the ceiling height, not the catalogue drop, and why adjustable suspension is offered where the height is still moving. Twenty days or less in production leaves room for a change that the schedule can still absorb.

Typical Applications

  • Made to the ceiling height, not the catalogue
  • Adjustable suspension where the height is moving
  • Packing verified by drop test before a run ships