Home / Solutions / Sampling to bulk production
Sampling to bulk production
A sample in thirty days, fit corrected and graded across the run, then complete size runs shipped together.
The first sample comes in thirty days. Because the last shop and the line are in the same building, a fit correction after that sample takes days rather than another international round trip.
Once fit is signed off, the run is graded and production opens. Complete size runs ship together so a retail display goes out full on the shelf date rather than arriving in pieces across two months.
Specifications
| First sample | 30 days |
|---|---|
| Fit correction | Days, not another sample round trip |
| Shipping | Complete size runs together |
Related Products
OEM and private label manufacturing
Production to the buyer's own design and label, with design, development, production and export handled by one team.
Coordinated collection development
Footwear and matching accessories cut from the same hides and dye lots, which two separate suppliers cannot reproduce.
Send us the style you want made
A sketch, a tech pack or a reference pair is enough to start. You will get a sample in thirty days and one contact who carries the style from there to shipment.